{"id":24779,"date":"2014-04-21T16:15:11","date_gmt":"2014-04-21T16:15:11","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7102"},"modified":"2014-04-21T16:15:11","modified_gmt":"2014-04-21T16:15:11","slug":"855-kw-roof-mount-solar-system-complete-at-nice-pak-products","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/855-kw-roof-mount-solar-system-complete-at-nice-pak-products\/","title":{"rendered":"855-kW Roof-Mount Solar System Complete at Nice-Pak Products"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Nice-Pak Products Inc. and its sister company, Professional Disposables International (PDI) &mdash; the world&rsquo;s leading producers of pre-moistened wipes &mdash; celebrated Earth Week with a ceremony marking completion of the solar array that was installed on the roof&nbsp; of its headquarters and manufacturing plant. This 855-kW array, the largest of<a href=\"http:\/\/solarbuildermag.com\/news\/855-kw-roof-mount-solar-system-complete-nice-pak-products\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9726,12497,4491],"class_list":["post-24779","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-northeast","tag-project","tag-roof"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24779","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=24779"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24779\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=24779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=24779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=24779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}