{"id":24781,"date":"2014-04-21T16:09:47","date_gmt":"2014-04-21T16:09:47","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7099"},"modified":"2014-04-21T16:09:47","modified_gmt":"2014-04-21T16:09:47","slug":"sunvalley-solar-to-build-1-1-mw-solar-system-for-wreden-ranch-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunvalley-solar-to-build-1-1-mw-solar-system-for-wreden-ranch-in-california\/","title":{"rendered":"Sunvalley Solar to Build 1.1-MW Solar System for Wreden Ranch in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Sunvalley Solar announced today it has been awarded a new 1,122-kW solar system installation contract from Wreden Ranch in Hanford, Calif. The 1,122-kW contract is for a system capable of generating 2,096,352Wh of electrical power annually. &ldquo;This is definitely a milestone for Sunvalley Solar in terms of the system size<a href=\"http:\/\/solarbuildermag.com\/news\/sunvalley-solar-build-1-1-mw-solar-system-wreden-ranch-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497],"class_list":["post-24781","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=24781"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24781\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=24781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=24781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=24781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}