{"id":248304,"date":"2016-12-12T16:30:03","date_gmt":"2016-12-12T16:30:03","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=15639"},"modified":"2016-12-12T16:30:03","modified_gmt":"2016-12-12T16:30:03","slug":"canadian-solars-new-solar-module-production-facility-is-ready-to-go","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/canadian-solars-new-solar-module-production-facility-is-ready-to-go\/","title":{"rendered":"Canadian Solar\u2019s new solar module production facility is ready to go"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar announced&nbsp;that its new solar module manufacturing in Sorocaba, Brazil, is ready to go. The new state-of-the-art manufacturing facility will be Brazil&rsquo;s largest, with 380 MW annual capacity of made in Brazil solar modules. The official inauguration of this state-of-the-art new solar module facility was attended by the distinguished<a href=\"http:\/\/solarbuildermag.com\/news\/canadian-solars-new-solar-module-production-facility-open\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12961,2906],"class_list":["post-248304","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-canadian-solar","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/248304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=248304"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/248304\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=248304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=248304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=248304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}