{"id":248657,"date":"2016-12-13T18:42:09","date_gmt":"2016-12-13T18:42:09","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=15659"},"modified":"2016-12-13T18:42:09","modified_gmt":"2016-12-13T18:42:09","slug":"sneak-peek-at-106-mw-solar-project-in-southern-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sneak-peek-at-106-mw-solar-project-in-southern-california\/","title":{"rendered":"Sneak peek at 106 MW solar project in Southern California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>This week brought a ribbon cutting ceremony for&nbsp;Midway I &amp; II Solar Electric Power Projects,&nbsp;located a few miles northwest of Calipatria in the great Mojave Desert in the Imperial Valley of Southern California. Behold: Now that the ribbon is cut, Solar Frontier Americas says the two&nbsp;solar electric power plants, totaling<a href=\"http:\/\/solarbuildermag.com\/news\/sneak-peek-at-106-mw-solar-project-in-southern-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13425,2906,13010,9974,5863,13659,14140],"class_list":["post-248657","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-blattner-energy","tag-news","tag-nextracker","tag-projects","tag-pv-modules","tag-solar-frontier","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/248657","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=248657"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/248657\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=248657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=248657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=248657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}