{"id":24880,"date":"2014-04-23T16:14:05","date_gmt":"2014-04-23T16:14:05","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7132"},"modified":"2014-04-23T16:14:05","modified_gmt":"2014-04-23T16:14:05","slug":"rgs-energy-to-epc-2-6-mw-solar-system-in-massachusetts","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rgs-energy-to-epc-2-6-mw-solar-system-in-massachusetts\/","title":{"rendered":"RGS Energy to EPC 2.6-MW Solar System in Massachusetts"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>RGS Energy, a nationwide leader of turnkey solar energy solutions for residential, commercial, and utility customers, has entered into an agreement to develop a project that includes the design, installation and operation of a 2.6-MW ground-mount solar system near Auburn, Mass. The Town of Auburn has agreed to purchase 100%<a href=\"http:\/\/solarbuildermag.com\/news\/rgs-energy-epc-2-6-mw-solar-system-massachusetts\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12494,2906,9726,12497],"class_list":["post-24880","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ground","tag-news","tag-northeast","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=24880"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24880\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=24880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=24880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=24880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}