{"id":24964,"date":"2014-04-24T19:50:35","date_gmt":"2014-04-24T19:50:35","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7135"},"modified":"2014-04-24T19:50:35","modified_gmt":"2014-04-24T19:50:35","slug":"cobalt-power-systems-installs-unirac-roof-mounts-on-400-kw-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/cobalt-power-systems-installs-unirac-roof-mounts-on-400-kw-project\/","title":{"rendered":"Cobalt Power Systems Installs Unirac Roof-Mounts on 400-kW Project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Unirac Inc&nbsp;., a Hilti Group Company, was selected by&nbsp;Cobalt Power Systems Inc.&nbsp;to provide a 397.5-kW&nbsp;Roof Mount (RM)&nbsp;mounting system recently installed at the&nbsp;Oshman Family JCC (OFJCC)&nbsp;campus, in Palo Alto, Calif. The installation, developed by&nbsp;THiNKnrg,&nbsp;is Palo Alto&rsquo;s second largest solar roof system and&nbsp;encompasses 1,840 solar panels on 12 buildings of the&nbsp;Taube Koret<a href=\"http:\/\/solarbuildermag.com\/news\/cobalt-power-systems-installs-unirac-roof-mounts-400-kw-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12496,2906,9667,12497,4491],"class_list":["post-24964","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mounting","tag-news","tag-pacific","tag-project","tag-roof"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=24964"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24964\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=24964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=24964"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=24964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}