{"id":24975,"date":"2014-04-24T22:17:59","date_gmt":"2014-04-24T22:17:59","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7139"},"modified":"2014-04-24T22:17:59","modified_gmt":"2014-04-24T22:17:59","slug":"250-mw-genesis-solar-energy-center-dedicated-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/250-mw-genesis-solar-energy-center-dedicated-in-california\/","title":{"rendered":"250-MW Genesis Solar Energy Center Dedicated in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NextEra Energy Resources LLC&nbsp;announced the official dedication of the company&rsquo;s Genesis Solar Energy Center, located in Riverside County, Calif. Approximately 150 local residents, federal, state and local officials and energy industry leaders, gathered today at the new solar facility, which is capable of generating 250 MW of solar power, enough<a href=\"http:\/\/solarbuildermag.com\/news\/250-mw-genesis-solar-energy-center-dedicated-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497],"class_list":["post-24975","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24975","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=24975"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24975\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=24975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=24975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=24975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}