{"id":250872,"date":"2016-12-20T13:00:34","date_gmt":"2016-12-20T13:00:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=15718"},"modified":"2016-12-20T13:00:34","modified_gmt":"2016-12-20T13:00:34","slug":"sunlink-grows-executive-roster-with-vp-of-operations-head-of-electrical-engineering","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunlink-grows-executive-roster-with-vp-of-operations-head-of-electrical-engineering\/","title":{"rendered":"SunLink grows executive roster with VP of operations, head of electrical engineering"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunLink Corp. continues to grow its executive bench strength with the addition of Vincent Sang as vice president of operations and Daniel Grill as head of electrical engineering. &ldquo;As an energy solutions company, SunLink is focused on optimizing every factor that contributes to making an energy project successful,&rdquo; explains SunLink<a href=\"http:\/\/solarbuildermag.com\/news\/sunlink-grows-executive-roster-vp-operations-head-electrical-engineering\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906],"class_list":["post-250872","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/250872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=250872"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/250872\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=250872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=250872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=250872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}