{"id":251452,"date":"2016-12-22T13:29:19","date_gmt":"2016-12-22T13:29:19","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=15736"},"modified":"2016-12-22T13:29:19","modified_gmt":"2016-12-22T13:29:19","slug":"spower-completes-largest-operating-solar-facility-in-its-portfolio","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/spower-completes-largest-operating-solar-facility-in-its-portfolio\/","title":{"rendered":"sPower completes largest operating solar facility in its portfolio"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>sPower and the California Department of Water Resources (DWR) kicked off commercial operations of the 107 megawatt (MWdc) Solverde 1 solar farm. The project is located in the City of Lancaster, Calif., in northern LA County. sPower installed more than 330,000 solar modules with a peak construction crew of 250<a href=\"http:\/\/solarbuildermag.com\/news\/spower-completes-largest-operating-solar-facility-in-its-portfolio\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,13148,13172],"class_list":["post-251452","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-spower","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/251452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=251452"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/251452\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=251452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=251452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=251452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}