{"id":251454,"date":"2016-12-22T13:12:41","date_gmt":"2016-12-22T13:12:41","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=15731"},"modified":"2016-12-22T13:12:41","modified_gmt":"2016-12-22T13:12:41","slug":"ithaca-college-goes-solar-with-remote-net-metered-array","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ithaca-college-goes-solar-with-remote-net-metered-array\/","title":{"rendered":"Ithaca College goes solar with remote-net-metered array"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Financier Greenwood Energy and installer Borrego Solar Systems completed a 2.9-MW remote-net-metered solar array for Ithaca College. Borrego Solar co-developed, designed and built the array while Greenwood Energy will own and operate it.&nbsp;Located approximately 40 miles from campus on 15 acres of land in the Ontario County Town of Seneca,<a href=\"http:\/\/solarbuildermag.com\/news\/ithica-college-goes-solar-with-remote-net-metered-array\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12984,13587,14340,2906,13429,9974],"class_list":["post-251454","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-borrego-solar","tag-college","tag-greenwood-energy","tag-news","tag-ppa","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/251454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=251454"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/251454\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=251454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=251454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=251454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}