{"id":253,"date":"2012-01-13T03:20:33","date_gmt":"2012-01-13T03:20:33","guid":{"rendered":"http:\/\/www.greenbuildingsNYC.com\/?p=3705"},"modified":"2012-01-13T03:20:33","modified_gmt":"2012-01-13T03:20:33","slug":"trophy-office-tower-could-bring-leed-platinum-to-high-line-in-west-chelsea","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/trophy-office-tower-could-bring-leed-platinum-to-high-line-in-west-chelsea\/","title":{"rendered":"Trophy Office Tower Could Bring LEED Platinum to High Line in West Chelsea"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Designed by Cook + Fox, the 9-story, 175,000-sqare-foot tower is slated for West 22nd Street and 10th Avenue and would feature 160 feet of High Line retail frontage.<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,101],"tags":[161,159,160,162,111,112,163,164,165,118,113,114,106,166],"class_list":["post-253","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-new-york-city","tag-albanese-organization","tag-chelsea","tag-cook-fox","tag-green-buildings-in-west-chelsea","tag-green-office-space","tag-green-real-estate","tag-high-line","tag-highland-capital","tag-jay-z","tag-leed-platinum","tag-leed-nc","tag-manhattan","tag-most-recent","tag-rick-cook"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=253"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}