{"id":253067,"date":"2017-02-15T20:57:28","date_gmt":"2017-02-15T20:57:28","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16264"},"modified":"2017-02-15T20:57:28","modified_gmt":"2017-02-15T20:57:28","slug":"how-sunlink-calcom-solar-streamlined-the-install-of-three-recent-solar-projects","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/how-sunlink-calcom-solar-streamlined-the-install-of-three-recent-solar-projects\/","title":{"rendered":"How SunLink, CalCom Solar streamlined the install of three recent solar projects"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>With shared expertise in designing, permitting, building and optimizing solar energy systems for agricultural operations, SunLink Corp. and CalCom Solar have successfully completed three solar projects in Shafter and Wasco, Calif. &ndash; the first in a larger Central Valley portfolio of installations. To streamline all project construction, SunLink standardized its<a href=\"http:\/\/solarbuildermag.com\/news\/how-sunlink-calcom-solar-streamlined-the-install-of-three-recent-solar-projects\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13009,2906,9974,12983],"class_list":["post-253067","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-calcom-solar","tag-news","tag-projects","tag-sunlink"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=253067"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253067\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=253067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=253067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=253067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}