{"id":253775,"date":"2017-02-20T16:01:28","date_gmt":"2017-02-20T16:01:28","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16289"},"modified":"2017-02-20T16:01:28","modified_gmt":"2017-02-20T16:01:28","slug":"wunder-capital-expands-mid-sized-commercial-solar-loan-program","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/wunder-capital-expands-mid-sized-commercial-solar-loan-program\/","title":{"rendered":"Wunder Capital expands mid-sized commercial solar loan program"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Following the successful launch of its Term Loan product last spring (here is an in-depth Q&amp;A we did with them at the time), Wunder Capital has announced an expansion to the scope of project types that are eligible for financing. Wunder, a financier in the small to mid-sized commercial solar<a href=\"http:\/\/solarbuildermag.com\/news\/wunder-capital-expands-mid-sized-commercial-solar-loan-program\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,1590,2906,13793],"class_list":["post-253775","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-financing","tag-news","tag-wunder-capital"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=253775"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253775\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=253775"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=253775"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=253775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}