{"id":253791,"date":"2017-02-20T16:57:39","date_gmt":"2017-02-20T16:57:39","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16297"},"modified":"2017-02-20T16:57:39","modified_gmt":"2017-02-20T16:57:39","slug":"caterpillar-completes-1-mw-pv-system-with-the-illinois-municipal-electric-agency","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/caterpillar-completes-1-mw-pv-system-with-the-illinois-municipal-electric-agency\/","title":{"rendered":"Caterpillar completes 1 MW PV system with the Illinois Municipal Electric Agency"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Caterpillar Inc. sent word that Cat dealer Altorfer has commissioned a 1000 kW solar PV system in Rantoul, Ill. Built to fulfill a 20-year power purchase agreement with the Illinois Municipal Electric Agency (IMEA), the installation was constructed on an eight-and-a-half-acre site near Heritage Lake Park and the University of<a href=\"http:\/\/solarbuildermag.com\/news\/caterpillar-completes-1-mw-solar-system-with-the-illinois-municipal-electric-agency\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13117,697,2906,9974],"class_list":["post-253791","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-caterpillar","tag-microgrid","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=253791"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/253791\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=253791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=253791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=253791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}