{"id":255732,"date":"2017-02-27T14:58:46","date_gmt":"2017-02-27T14:58:46","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16413"},"modified":"2017-02-27T14:58:46","modified_gmt":"2017-02-27T14:58:46","slug":"sunpower-starts-construction-on-56-mw-power-plant-in-oregon","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunpower-starts-construction-on-56-mw-power-plant-in-oregon\/","title":{"rendered":"SunPower starts construction on 56-MW power plant in Oregon"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunPower Corp. started construction on the 56-megawatt (AC) Gala Solar Power Plant in Crook County, Ore. The project, which is expected to be the state&rsquo;s largest operating solar power plant when it is completed by the end of 2017, is anticipated to create approximately 300 jobs during peak construction. &ldquo;I&rsquo;ve<a href=\"http:\/\/solarbuildermag.com\/news\/sunpower-starts-construction-56-mw-power-plant-oregon\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,13107],"class_list":["post-255732","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-sunpower-corp"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/255732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=255732"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/255732\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=255732"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=255732"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=255732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}