{"id":26340,"date":"2014-04-25T17:29:31","date_gmt":"2014-04-25T17:29:31","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7150"},"modified":"2014-04-25T17:29:31","modified_gmt":"2014-04-25T17:29:31","slug":"e-on-breaks-ground-on-largest-solar-array-on-a-military-installation","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/e-on-breaks-ground-on-largest-solar-array-on-a-military-installation\/","title":{"rendered":"E.ON Breaks Ground on Largest Solar Array on a Military Installation"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>E.ON Climate &amp; Renewables (E.ON) Solar broke ground today on its newest 14-MWac\/18-MWdc solar photovoltaic project at the U.S. Army&rsquo;s Ft. Huachuca in Arizona.&nbsp;The project will serve about 25 percent of Fort Huachuca&rsquo;s annual electricity requirement. Tucson Electric Power (TEP) contracted with E.ON for the construction management of the project.<a href=\"http:\/\/solarbuildermag.com\/news\/e-breaks-ground-largest-solar-array-military-installation\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,12497,9674],"class_list":["post-26340","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-project","tag-southwest"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=26340"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26340\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=26340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=26340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=26340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}