{"id":264285,"date":"2017-03-28T17:16:38","date_gmt":"2017-03-28T17:16:38","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16689"},"modified":"2017-03-28T17:16:38","modified_gmt":"2017-03-28T17:16:38","slug":"copper-mountain-solar-94-mw-in-nevada-goes-with-sma-inverters","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/copper-mountain-solar-94-mw-in-nevada-goes-with-sma-inverters\/","title":{"rendered":"Copper Mountain Solar (94 MW) in Nevada goes with SMA inverters"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SMA inverters were recently selected by Amec Foster Wheeler for Sempra Renewables&rsquo; 94 MW Copper Mountain Solar 4 project in Boulder City, Nev. This is the fourth phase of the Copper Mountain Solar Complex, one of the largest PV solar facilities in the U.S. When Copper Mountain Solar 4 is<a href=\"http:\/\/solarbuildermag.com\/news\/copper-mountain-solar-94-mw-nevada-goes-sma-inverters\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,2906,9974,13436,14140],"class_list":["post-264285","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-news","tag-projects","tag-sma-america","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/264285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=264285"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/264285\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=264285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=264285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=264285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}