{"id":26463,"date":"2014-04-29T16:23:17","date_gmt":"2014-04-29T16:23:17","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7162"},"modified":"2014-04-29T16:23:17","modified_gmt":"2014-04-29T16:23:17","slug":"nrg-energy-midamerican-solar-complete-worlds-largest-solar-pv-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nrg-energy-midamerican-solar-complete-worlds-largest-solar-pv-facility\/","title":{"rendered":"NRG Energy, MidAmerican Solar Complete World\u2019s Largest Solar PV Facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NRG Energy Inc., through its wholly-owned subsidiary NRG Solar, along with partner MidAmerican Solar announced they have achieved substantial completion at their&nbsp;Agua Caliente Solar Photovoltaic Facility&nbsp;, a 290-MW photovoltaic facility located on 2,400 acres of land between Yuma and Phoenix, Ariz. The electricity that is generated by the station, which<a href=\"http:\/\/solarbuildermag.com\/news\/nrg-energy-midamerican-solar-complete-worlds-largest-solar-pv-facility\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,12497,9674],"class_list":["post-26463","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-project","tag-southwest"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=26463"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26463\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=26463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=26463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=26463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}