{"id":266129,"date":"2017-04-04T13:32:02","date_gmt":"2017-04-04T13:32:02","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16753"},"modified":"2017-04-04T13:32:02","modified_gmt":"2017-04-04T13:32:02","slug":"yingli-uses-new-n-type-solar-cell-production-process-to-improve-bifacial-efficiency","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/yingli-uses-new-n-type-solar-cell-production-process-to-improve-bifacial-efficiency\/","title":{"rendered":"Yingli uses new n-type solar cell production process to improve bifacial efficiency"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Yingli Green Energy Holding Co. says it has produced the first interdigitated back contact (IBC) n-type solar cells based on 6-inch wafers at an industrial pilot line within just three months by adopting the new production process co-developed by Dutch research center ECN and equipment manufacturer Tempress. The production process<a href=\"http:\/\/solarbuildermag.com\/news\/yingli-uses-new-n-type-solar-cell-production-process-to-improve-bifacial-efficiency\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,5863,488],"class_list":["post-266129","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pv-modules","tag-solar-cells"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/266129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=266129"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/266129\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=266129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=266129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=266129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}