{"id":26800,"date":"2014-05-06T21:48:53","date_gmt":"2014-05-06T21:48:53","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7280"},"modified":"2014-05-06T21:48:53","modified_gmt":"2014-05-06T21:48:53","slug":"suniva-solectria-power-321-kw-install-at-arkansas-va-medical-center","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/suniva-solectria-power-321-kw-install-at-arkansas-va-medical-center\/","title":{"rendered":"Suniva, Solectria Power 321-kW Install at Arkansas VA Medical Center"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Suniva, a metro-Atlanta based manufacturer of high-quality, high-efficiency crystalline silicon solar cells and modules, today announces its high-powered modules power the Veterans Health Care System of the Ozarks, in Fayetteville, Arkansas. This healthcare services unit joins a large and growing list of solar powered Veteran&rsquo;s Administration facilities throughout the United<a href=\"http:\/\/solarbuildermag.com\/news\/suniva-solectria-power-321-kw-install-arkansas-va-medical-center\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12492,12491,12487,2906,12497,9751],"class_list":["post-26800","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carportcanopy","tag-inverters","tag-modules","tag-news","tag-project","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=26800"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26800\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=26800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=26800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=26800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}