{"id":26890,"date":"2014-05-08T16:35:15","date_gmt":"2014-05-08T16:35:15","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7297"},"modified":"2014-05-08T16:35:15","modified_gmt":"2014-05-08T16:35:15","slug":"solarcraft-completes-650-kw-install-at-winery-production-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solarcraft-completes-650-kw-install-at-winery-production-facility\/","title":{"rendered":"SolarCraft Completes 650-kW Install at Winery Production Facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Novato and Sonoma-based SolarCraft announced the completion of a 649-kW solar power system at Hess Collection Winery providing nearly 100% of the electrical needs for its Napa, Calif., production facility.&nbsp; Designed and built by SolarCraft, the new system will reduce Hess&rsquo;s utility costs by thousands every year, while reducing the<a href=\"http:\/\/solarbuildermag.com\/news\/solarcraft-completes-650-kw-install-winery-production-facility\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12487,2906,9667,12497,4491],"class_list":["post-26890","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-modules","tag-news","tag-pacific","tag-project","tag-roof"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=26890"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/26890\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=26890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=26890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=26890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}