{"id":270022,"date":"2017-04-17T14:13:25","date_gmt":"2017-04-17T14:13:25","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16832"},"modified":"2017-04-17T14:13:25","modified_gmt":"2017-04-17T14:13:25","slug":"yaskawa-solectria-solar-inverters-now-fully-compatible-with-tigo-optimizers","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/yaskawa-solectria-solar-inverters-now-fully-compatible-with-tigo-optimizers\/","title":{"rendered":"Yaskawa-Solectria Solar inverters now fully compatible with Tigo optimizers"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Yaskawa &ndash; Solectria Solar announced full compatibility of its three-phase string inverters with Tigo&rsquo;s module optimizers, fully complying with the 2014 and 2017 National Electric Code (NEC) 690.12 Rapid Shutdown Requirements. &ldquo;We are pleased to offer our customers a solution that complies with the upcoming module-level rapid shutdown requirements,&rdquo; said<a href=\"http:\/\/solarbuildermag.com\/news\/yaskawa-solectria-solar-inverters-now-fully-compatible-with-tigo-optimizers\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,2906,13740,3000,13445,13842],"class_list":["post-270022","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-news","tag-optimizers","tag-products","tag-tigo-energy","tag-yaskawa-solectria"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/270022","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=270022"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/270022\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=270022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=270022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=270022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}