{"id":270898,"date":"2017-04-20T17:40:05","date_gmt":"2017-04-20T17:40:05","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16881"},"modified":"2017-04-20T17:40:05","modified_gmt":"2017-04-20T17:40:05","slug":"solar-plus-storage-microgrid-now-live-at-panasonics-denver-operations-hub","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-plus-storage-microgrid-now-live-at-panasonics-denver-operations-hub\/","title":{"rendered":"Solar-plus-storage microgrid now live at Panasonic\u2019s Denver operations hub"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Younicos has commissioned a 1 MW \/ 2 MWh lithium-ion battery system in partnership with Panasonic and Xcel Energy. The news was announced at the Energy Storage Association&rsquo;s 27th Annual Conference, which offered two delegate group tours of the multi-resource microgrid. The system is located at Pe&ntilde;a Station NEXT, a<a href=\"http:\/\/solarbuildermag.com\/news\/solar-plus-storage-microgrid-now-live-panasonics-denver-operations-hub\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,2906,1564,9974,14247],"class_list":["post-270898","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-news","tag-panasonic","tag-projects","tag-younicos"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/270898","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=270898"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/270898\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=270898"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=270898"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=270898"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}