{"id":272615,"date":"2017-04-26T18:06:38","date_gmt":"2017-04-26T18:06:38","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=16931"},"modified":"2017-04-26T18:06:38","modified_gmt":"2017-04-26T18:06:38","slug":"rayton-solars-innovative-pv-panel-production-process-will-deliver-first-system-in-2017","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rayton-solars-innovative-pv-panel-production-process-will-deliver-first-system-in-2017\/","title":{"rendered":"Rayton Solar\u2019s innovative PV panel production process will deliver first system in 2017"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Phoenix Nuclear Labs (PNL) has signed a long-term agreement to be the exclusive supplier of high current proton accelerators to California-based Rayton Solar to produce low cost, high efficiency solar panels. Under the terms of the agreement, PNL will deliver the first system to Rayton at the end of 2017,<a href=\"http:\/\/solarbuildermag.com\/news\/rayton-solars-innovative-pv-panel-production-process-will-deliver-first-system-2017\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,5863,13253],"class_list":["post-272615","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pv-modules","tag-rayton-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/272615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=272615"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/272615\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=272615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=272615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=272615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}