{"id":27302,"date":"2014-05-19T12:30:51","date_gmt":"2014-05-19T12:30:51","guid":{"rendered":"http:\/\/leedpoints.com\/?guid=bd61df6bf3912ad5540814d7adddfdfd"},"modified":"2014-05-19T12:30:51","modified_gmt":"2014-05-19T12:30:51","slug":"electronic-load-features-300-w-power-rating","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/electronic-load-features-300-w-power-rating\/","title":{"rendered":"Electronic Load features 300 W power rating."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>With input rating of 0&amp;ndash;15 A and 0&amp;ndash;500 V, Model EL9712B offers 6 modes of operation and dual range 16-bit resolution measurements. Any current carrying component may be tested and wide range of dynamic load conditions may be simulated including solar cell and fuel cell loading, and LED testing. Fully protected against OP, OC, OV, OT, and reverse polarity, electronic load offers 999 measurements\/hr, constant current mode soft-start, dynamic pulsing, and programmable duty cycles.<\/p>\n<p><b>This story is related to the following:<\/b><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/electronic-components-devices\" target=\"_blank\">Electronic Components and Devices<\/a> Sponsored by:  <a target=\"_blank\" href=\"http:\/\/news.thomasnet.com\/redir.html?lnty=rssad&amp;spclid=9476&amp;prid=20026968&amp;cat=772&amp;goto=http%3A%2F%2Fwww.globtek.com\">Globtek Inc. &#8211; Your Power Partner&#8230;For Over 20 Years!<\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/green-clean\" target=\"_blank\">Green &amp; Clean<\/a><\/p>\n<p>Search for suppliers of: <a href=\"http:\/\/www.thomasnet.com\/products\/meter-testing-loads-44620201-1.html\" target=\"_blank\">Meter Testing Loads<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/electronic-loads-97002406-1.html\" target=\"_blank\">Electronic Loads<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4350],"tags":[],"class_list":["post-27302","post","type-post","status-publish","format-standard","hentry","category-green-clean"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/27302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=27302"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/27302\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=27302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=27302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=27302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}