{"id":276537,"date":"2017-05-08T13:18:14","date_gmt":"2017-05-08T13:18:14","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17011"},"modified":"2017-05-08T13:18:14","modified_gmt":"2017-05-08T13:18:14","slug":"mexico-solar-expansion-two-solar-tracker-companies-with-latin-america-updates","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/mexico-solar-expansion-two-solar-tracker-companies-with-latin-america-updates\/","title":{"rendered":"Mexico solar expansion: Two solar tracker companies with Latin America updates"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Array Technologies Inc. (ATI) and NEXTacker, two of the top solar tracker companies out there, had news last week concerning moves into Mexico. ATI opens new office ATI&rsquo;s was the most notable of the announcements, as it is expanding its industry-leading tracker services into Latin America, supported by a new<a href=\"http:\/\/solarbuildermag.com\/news\/mexico-solar-expansion-two-solar-tracker-companies-latin-america-updates\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13251,12637,2906,13010,13050],"class_list":["post-276537","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-array-technologies-inc-ati","tag-mounting-guide","tag-news","tag-nextracker","tag-solar-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/276537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=276537"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/276537\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=276537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=276537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=276537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}