{"id":27943,"date":"2014-06-05T22:05:36","date_gmt":"2014-06-05T22:05:36","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7477"},"modified":"2014-06-05T22:05:36","modified_gmt":"2014-06-05T22:05:36","slug":"kdc-solar-completes-9-95-mw-system-at-pharmaceutical-company-in-nj-2","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/kdc-solar-completes-9-95-mw-system-at-pharmaceutical-company-in-nj-2\/","title":{"rendered":"KDC Solar Completes 9.95-MW System at Pharmaceutical Company in NJ"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>KDC Solar LLC has commenced commercial operations of its 9.95-MW solar panel system in&nbsp;New Jersey. The system will provide electricity to Eli Lilly and Company&rsquo;s ImClone biopharmaceutical operations in Branchburg, N.J.&nbsp; Lilly acquired ImClone Systems in 2008. The solar panel project is the largest photovoltaic (PV) solar system supplying solar<a href=\"http:\/\/solarbuildermag.com\/news\/kdc-solar-completes-9-95-mw-system-pharmaceutical-company-nj\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12494,12491,2906,12497],"class_list":["post-27943","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ground","tag-inverters","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/27943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=27943"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/27943\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=27943"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=27943"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=27943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}