{"id":28072,"date":"2014-06-10T15:00:34","date_gmt":"2014-06-10T15:00:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7482"},"modified":"2014-06-10T15:00:34","modified_gmt":"2014-06-10T15:00:34","slug":"array-technologies-trackers-to-power-40-mw-solar-project-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/array-technologies-trackers-to-power-40-mw-solar-project-in-california\/","title":{"rendered":"Array Technologies Trackers to Power 40-MW Solar Project in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Pumpjack and Wildwood PV solar projects, 20 MW each, will showcase Array Technologies&rsquo; industry-leading DuraTrack HZ single-axis solar tracker. Swinerton Renewable Energy, one of the solar industry&rsquo;s premiere construction firms, will build the sites under an engineering, procurement and construction (EPC) contractand has officially chosen the DuraTrack HZ single-axis<a href=\"http:\/\/solarbuildermag.com\/news\/array-technologies-trackers-power-40-mw-solar-project-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12494,2906,9667,12497,12500],"class_list":["post-28072","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ground","tag-news","tag-pacific","tag-project","tag-tracking"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28072"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28072\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}