{"id":282895,"date":"2017-05-30T16:58:13","date_gmt":"2017-05-30T16:58:13","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17253"},"modified":"2017-05-30T16:58:13","modified_gmt":"2017-05-30T16:58:13","slug":"younicos-delivers-mw-scale-storage-system-to-austin-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/younicos-delivers-mw-scale-storage-system-to-austin-energy\/","title":{"rendered":"Younicos delivers MW-scale storage system to Austin Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Younicos has signed an agreement to deliver a megawatt-scale battery storage system to Austin Energy, as part of a U.S. Department of Energy (DOE)-funded initiative known as the Sustainable and Holistic Integration of Energy Storage and Solar PV (SHINES) project. Younicos will collaborate with the project&rsquo;s prime contractor, Doosan GridTech,<a href=\"http:\/\/solarbuildermag.com\/news\/younicos-delivers-mw-scale-storage-system-austin-energy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,2906,9974,14140,14247],"class_list":["post-282895","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-news","tag-projects","tag-utility-scale","tag-younicos"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/282895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=282895"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/282895\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=282895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=282895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=282895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}