{"id":284719,"date":"2017-06-05T18:50:51","date_gmt":"2017-06-05T18:50:51","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17307"},"modified":"2017-06-05T18:50:51","modified_gmt":"2017-06-05T18:50:51","slug":"silicor-materials-reports-on-its-first-p-type-mono-perc-production-results","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/silicor-materials-reports-on-its-first-p-type-mono-perc-production-results\/","title":{"rendered":"Silicor Materials reports on its first p-type mono PERC production results"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Silicor Materials, Inc., says that, in its first ever attempt, the company has produced p-type mono PERC (Passivated Emitter Rear Cell) cells at approximately 20 percent efficiency, using 100 percent of its standard silicon feedstock. &ldquo;We are extremely pleased with the results of this first attempt at mono cell production,&rdquo;<a href=\"http:\/\/solarbuildermag.com\/news\/silicor-materials-reports-on-its-first-p-type-mono-perc-production-results\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,14164,5863,14493],"class_list":["post-284719","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-perc","tag-pv-modules","tag-silicor-materials"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/284719","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=284719"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/284719\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=284719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=284719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=284719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}