{"id":28521,"date":"2014-06-20T13:45:30","date_gmt":"2014-06-20T13:45:30","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7558"},"modified":"2014-06-20T13:45:30","modified_gmt":"2014-06-20T13:45:30","slug":"vista-solar-to-install-160-kw-solar-system-for-california-food-and-wine-distributor","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/vista-solar-to-install-160-kw-solar-system-for-california-food-and-wine-distributor\/","title":{"rendered":"Vista Solar to Install 160-kW Solar System for California Food and Wine Distributor"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Vista Solar, a Bay-area commercial solar installer, announced that it will install a 160-kW solar system for food and wine distributor Lettieri &amp; Company. &ldquo;The timing was right for us to go solar, and we are excited to have Vista as our partner,&rdquo; said Frank Lettieri, president of Lettieri &amp;<a href=\"http:\/\/solarbuildermag.com\/news\/vista-solar-install-160-kw-solar-system-california-food-wine-distributor\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,12487,2906,9667,12497],"class_list":["post-28521","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-modules","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28521"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28521\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}