{"id":28610,"date":"2014-06-23T15:48:46","date_gmt":"2014-06-23T15:48:46","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7573"},"modified":"2014-06-23T15:48:46","modified_gmt":"2014-06-23T15:48:46","slug":"solarworld-supplies-complete-mexicos-largest-rooftop-solar-array","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solarworld-supplies-complete-mexicos-largest-rooftop-solar-array\/","title":{"rendered":"SolarWorld Supplies Complete Mexico\u2019s Largest Rooftop Solar Array"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>An audio-headset factory in Tijuana, Mexico, is now home to the largest, privately owned roof-mounted solar installation in all of Latin America. The 1.16-MW system features&nbsp;solar panels,&nbsp;racking&nbsp;and&nbsp;system engineering&nbsp;from&nbsp;SolarWorld, the largest solar manufacturer in the Americas for nearly 40 years. The system will power the Mexico operations of Plantronics, a global<a href=\"http:\/\/solarbuildermag.com\/news\/solarworld-supplies-complete-mexicos-largest-rooftop-solar-array\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12490,12487,12496,2906,12497,4491],"class_list":["post-28610","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-latin","tag-modules","tag-mounting","tag-news","tag-project","tag-roof"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28610"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28610\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28610"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28610"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}