{"id":287199,"date":"2017-06-14T13:08:13","date_gmt":"2017-06-14T13:08:13","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17402"},"modified":"2017-06-14T13:08:13","modified_gmt":"2017-06-14T13:08:13","slug":"this-new-solar-energy-busbar-bypass-breaker-could-cut-install-costs","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/this-new-solar-energy-busbar-bypass-breaker-could-cut-install-costs\/","title":{"rendered":"This new solar energy busbar bypass breaker could cut install costs"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>While interest in renewable energy solutions such as solar power in residential and commercial settings is on the rise, and more Americans convert to electric vehicles (EV&rsquo;s), one of the biggest remaining impediments is the hidden cost of upgrading the electric panel, also known as the load center or panelboard.<a href=\"http:\/\/solarbuildermag.com\/news\/this-new-solar-energy-busbar-bypass-breaker-could-cut-install-costs\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12495,14513,2906,3000,14514,13095],"class_list":["post-287199","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bos","tag-busbar","tag-news","tag-products","tag-q-factory","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/287199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=287199"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/287199\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=287199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=287199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=287199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}