{"id":28757,"date":"2014-06-26T13:14:05","date_gmt":"2014-06-26T13:14:05","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7631"},"modified":"2014-06-26T13:14:05","modified_gmt":"2014-06-26T13:14:05","slug":"canadian-solar-to-epc-canadas-largest-solar-farm-at-140-mw","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/canadian-solar-to-epc-canadas-largest-solar-farm-at-140-mw\/","title":{"rendered":"Canadian Solar to EPC Canada\u2019s Largest Solar Farm at 140 MW"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar Inc., one of the world&rsquo;s largest solar power companies, announced its wholly-owned subsidiary Canadian Solar Solutions Inc. has entered into an Engineering, Procurement, and Construction (EPC) agreement with Kingston Solar LP, a solar energy project developed by Samsung Renewable Energy Inc. (Samsung) for the construction of a 140-MWdc<a href=\"http:\/\/solarbuildermag.com\/news\/canadian-solar-epc-canadas-largest-solar-farm-140-mw\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5462,57,9666],"tags":[12487,2906,12497],"class_list":["post-28757","post","type-post","status-publish","format-standard","hentry","category-canada-international","category-leed-news","category-solar-power-energy","tag-modules","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28757"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28757\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}