{"id":28895,"date":"2014-07-02T13:28:29","date_gmt":"2014-07-02T13:28:29","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7656"},"modified":"2014-07-02T13:28:29","modified_gmt":"2014-07-02T13:28:29","slug":"parker-hannifin-to-launch-new-central-inverter-at-intersolar-na-2","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/parker-hannifin-to-launch-new-central-inverter-at-intersolar-na-2\/","title":{"rendered":"Parker Hannifin to Launch New Central Inverter at Intersolar NA"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Parker Hannifin&rsquo;s Global Energy Grid Tie Division has launched a new utility-scale PV solar inverter with grid friendly features for applications up to 2 MW. The 890GT-S Outdoor Central Solar Inverter features a high efficiency 1,000-volt design that integrates proven IGBT power conversion with Parker&rsquo;s ground breaking two-phase refrigerant cooling<a href=\"http:\/\/solarbuildermag.com\/news\/parker-hannifin-launch-new-central-inverter-intersolar-na\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,2906],"class_list":["post-28895","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28895"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28895\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}