{"id":28912,"date":"2014-07-02T20:58:20","date_gmt":"2014-07-02T20:58:20","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7663"},"modified":"2014-07-02T20:58:20","modified_gmt":"2014-07-02T20:58:20","slug":"powers-solar-frames-contracted-for-6-1-mw-project-in-st-louis","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/powers-solar-frames-contracted-for-6-1-mw-project-in-st-louis\/","title":{"rendered":"Powers Solar Frames Contracted for 6.1-MW Project in St. Louis"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Powers Solar Frames LLC of Phoenix has been awarded a contract&nbsp;to provide solar ground-mount racking components for Ameren Missouri&rsquo;s 6.1-MW solar energy facility on a 19 acre site adjacent to the utility&rsquo;s Belleau substation in St. Charles County. Pending final changes, the project will feature more than 20,000 solar panels,<a href=\"http:\/\/solarbuildermag.com\/news\/powers-solar-frames-contracted-6-1-mw-project-st-louis\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12494,9679,12496,2906,12497],"class_list":["post-28912","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ground","tag-midwest","tag-mounting","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28912"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28912\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}