{"id":28978,"date":"2014-07-07T17:26:19","date_gmt":"2014-07-07T17:26:19","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7678"},"modified":"2014-07-07T17:26:19","modified_gmt":"2014-07-07T17:26:19","slug":"et-solar-modules-to-power-six-projects-in-north-carolina-totaling-24-5-mw","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/et-solar-modules-to-power-six-projects-in-north-carolina-totaling-24-5-mw\/","title":{"rendered":"ET Solar Modules to Power Six Projects in North Carolina Totaling 24.5 MW"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>ET Solar Energy Corp. announces that its high efficiency PV modules will power six utility scale projects throughout the state of North Carolina, with a combined capacity of 24.5 MW. FLS Energy, a full service solar energy provider, will finance, design, construct, own and operate the portfolio of projects. The<a href=\"http:\/\/solarbuildermag.com\/news\/et-solar-modules-power-six-projects-north-carolina-totaling-24-5-mw\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,12497,9751],"class_list":["post-28978","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-project","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28978"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28978\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28978"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28978"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}