{"id":28994,"date":"2014-07-08T12:00:22","date_gmt":"2014-07-08T12:00:22","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7659"},"modified":"2014-07-08T12:00:22","modified_gmt":"2014-07-08T12:00:22","slug":"spower-borrego-solar-break-ground-on-8-3-mw-of-projects-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/spower-borrego-solar-break-ground-on-8-3-mw-of-projects-in-california\/","title":{"rendered":"sPower, Borrego Solar Break Ground on 8.3 MW of Projects in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Borrego Solar Systems Inc., a leading designer, developer, installer and financier of grid-tied solar photovoltaic (PV) systems, today announced that it has broken ground on the Seneca Solar Projects, a total of 8.3 MW of fixed-tilt ground mounted solar projects in Victorville, Calif. Owned by Salt Lake City-based sPower (Sustainable<a href=\"http:\/\/solarbuildermag.com\/news\/spower-borrego-solar-break-ground-8-3-mw-projects-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497],"class_list":["post-28994","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=28994"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/28994\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=28994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=28994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=28994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}