{"id":29196,"date":"2014-07-15T19:13:41","date_gmt":"2014-07-15T19:13:41","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7744"},"modified":"2014-07-15T19:13:41","modified_gmt":"2014-07-15T19:13:41","slug":"dominion-virginia-power-to-install-800-kw-solar-system-on-two-roofs","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/dominion-virginia-power-to-install-800-kw-solar-system-on-two-roofs\/","title":{"rendered":"Dominion Virginia Power to Install 800-kW Solar System on Two Roofs"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Dominion Virginia Power will install more than 3,000 solar panels capable of generating more than 800 kW&nbsp;of electricity &ndash; enough to power nearly 200 homes &ndash; at the Prologis Concorde Distribution Center in Sterling, Va. The panels will be installed on the rooftops of two adjacent buildings on its campus<a href=\"http:\/\/solarbuildermag.com\/news\/dominion-virginia-power-install-800-kw-solar-system-two-roofs\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,12497,4491,9751],"class_list":["post-29196","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-project","tag-roof","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29196","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=29196"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29196\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=29196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=29196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=29196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}