{"id":29478,"date":"2014-07-28T13:24:56","date_gmt":"2014-07-28T13:24:56","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7783"},"modified":"2014-07-28T13:24:56","modified_gmt":"2014-07-28T13:24:56","slug":"solarreserve-to-install-20-mw-pv-project-in-el-salvador","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solarreserve-to-install-20-mw-pv-project-in-el-salvador\/","title":{"rendered":"SolarReserve to Install 20-MW PV Project in El Salvador"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SolarReserve, a leading global developer of utility-scale solar power projects and advanced thermal energy storage technology, today announced that it signed a supply contract for its 20-MW Acajutla photovoltaic (PV) solar power project in El Salvador as part of a highly competitive tender solicitation by the local electric distribution companies.<a href=\"http:\/\/solarbuildermag.com\/news\/solarreserve-install-20-mw-pv-project-el-salvador\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12490,2906,12497],"class_list":["post-29478","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-latin","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=29478"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29478\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=29478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=29478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=29478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}