{"id":29533,"date":"2014-07-30T12:51:44","date_gmt":"2014-07-30T12:51:44","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7803"},"modified":"2014-07-30T12:51:44","modified_gmt":"2014-07-30T12:51:44","slug":"vista-solar-installs-153-kw-sunpower-system-for-california-church","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/vista-solar-installs-153-kw-sunpower-system-for-california-church\/","title":{"rendered":"Vista Solar Installs 153-kW SunPower System for California Church"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Vista Solar today announced the completion of a 153-kW solar power system for WestGate Church in San Jose, Calif. The system, which was designed and installed by Vista Solar, is expected to offset WestGate&rsquo;s electricity bill by nearly 95 percent, and generate more than 250,000 kilowatt-hours of clean energy each<a href=\"http:\/\/solarbuildermag.com\/news\/vista-solar-installs-153-kw-sunpower-system-california-church\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12487,2906,9667,12497],"class_list":["post-29533","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-modules","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29533","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=29533"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29533\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=29533"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=29533"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=29533"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}