{"id":295761,"date":"2017-07-10T17:38:14","date_gmt":"2017-07-10T17:38:14","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17635"},"modified":"2017-07-10T17:38:14","modified_gmt":"2017-07-10T17:38:14","slug":"solar-flexrack-previews-tdp-2-0-turnkey-solar-tracker-at-intersolar-this-week","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-flexrack-previews-tdp-2-0-turnkey-solar-tracker-at-intersolar-this-week\/","title":{"rendered":"Solar FlexRack previews TDP 2.0 Turnkey Solar Tracker at Intersolar this week"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar FlexRack, a division of Northern States Metals and a leader in solar tracker, mounting and project support services, will preview its new TDP 2.0 Turnkey Solar Tracker at Intersolar N.A, July 11-13. The TDP 2.0 Tracker&rsquo;s new advanced design, BalanceTrac, increases solar power systems&rsquo; energy yields and reduces installation<a href=\"http:\/\/solarbuildermag.com\/news\/solar-flexrack-previews-tdp-2-0-turnkey-solar-tracker-at-intersolar-this-week\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13333,12637,2906,3000,13220,13050],"class_list":["post-295761","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-intersolar","tag-mounting-guide","tag-news","tag-products","tag-solar-flexrack","tag-solar-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/295761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=295761"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/295761\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=295761"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=295761"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=295761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}