{"id":296004,"date":"2017-07-11T17:58:49","date_gmt":"2017-07-11T17:58:49","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17667"},"modified":"2017-07-11T17:58:49","modified_gmt":"2017-07-11T17:58:49","slug":"phase-three-of-800-mw-mount-signal-solar-farm-begins-says-8minuteenergy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/phase-three-of-800-mw-mount-signal-solar-farm-begins-says-8minuteenergy\/","title":{"rendered":"Phase three of 800-MW Mount Signal Solar Farm begins, says 8minuteenergy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>8minutenergy Renewables, the largest independent solar power developer in the U.S., and global private asset manager Capital Dynamics, announced the acquisition and development of the 328 MW-dc Mount Signal 3 PV project located in the city of Calexico in California&rsquo;s Imperial Valley. This is the third phase of the 800<a href=\"http:\/\/solarbuildermag.com\/news\/phase-three-of-800-mw-mount-signal-solar-farm-begins-says-8minuteenergy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14184,2906,9974],"class_list":["post-296004","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-8minutenergy-renewables","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/296004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=296004"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/296004\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=296004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=296004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=296004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}