{"id":297937,"date":"2017-07-17T15:24:26","date_gmt":"2017-07-17T15:24:26","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17705"},"modified":"2017-07-17T15:24:26","modified_gmt":"2017-07-17T15:24:26","slug":"soltec-trackers-chosen-for-high-wind-pv-site-in-south-carolina","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/soltec-trackers-chosen-for-high-wind-pv-site-in-south-carolina\/","title":{"rendered":"Soltec trackers chosen for high-wind PV site in South Carolina"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Soltec, a manufacturer and supplier of solar PV tracking equipment,&nbsp;is supplying 28 MW of its SF Utility horizontal single-axis tracker to a solar PV power plant being constructed in the municipality of Estill, in the state of South Carolina. Soltec solar trackers are designed to operate normally even in harsh<a href=\"http:\/\/solarbuildermag.com\/news\/soltec-trackers-chosen-for-high-wind-pv-site-in-south-carolina\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,13050,14559],"class_list":["post-297937","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-solar-trackers","tag-soltec"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/297937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=297937"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/297937\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=297937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=297937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=297937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}