{"id":29855,"date":"2014-08-14T18:46:09","date_gmt":"2014-08-14T18:46:09","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7866"},"modified":"2014-08-14T18:46:09","modified_gmt":"2014-08-14T18:46:09","slug":"alabama-steel-company-installs-340-kw-system-with-solar-flexrack-mounts","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/alabama-steel-company-installs-340-kw-system-with-solar-flexrack-mounts\/","title":{"rendered":"Alabama Steel Company Installs 340-kW System with Solar FlexRack Mounts"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Facing rising energy costs and increased power demand from their steel manufacturing and fabrication plants, Apel Steel Corporation in Cullman, Alabama, contracted ACE LLC SOLAR to move them off-grid with a PV solar power generating system. The 340-kW system was designed and developed to generate 470,213 kWH of AC electrical<a href=\"http:\/\/solarbuildermag.com\/news\/alabama-steel-company-installs-340-kw-system-solar-flexrack-mounts\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12487,12496,2906,12497,9751],"class_list":["post-29855","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-modules","tag-mounting","tag-news","tag-project","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=29855"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/29855\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=29855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=29855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=29855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}