{"id":300154,"date":"2017-07-24T14:14:54","date_gmt":"2017-07-24T14:14:54","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17770"},"modified":"2017-07-24T14:14:54","modified_gmt":"2017-07-24T14:14:54","slug":"universities-adding-solar-update-on-pv-projects-at-notre-dame-university-of-virginia","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/universities-adding-solar-update-on-pv-projects-at-notre-dame-university-of-virginia\/","title":{"rendered":"Universities adding solar: Update on PV projects at Notre Dame, University of Virginia"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Notre Dame goes solar Inovateus Solar has completed a 144.72-kW solar photovoltaic installation for the University of Notre Dame. The ground-mounted system is located at the Kenmore Warehouse storage facility and is the largest solar array built by the university to date as well as the biggest PV installation in<a href=\"http:\/\/solarbuildermag.com\/news\/universities-solar-update-on-pv-projects-at-notre-dame-university-of-virginia\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14291,9607,2906,9974],"class_list":["post-300154","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-coronal-energy","tag-inovateus-solar","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/300154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=300154"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/300154\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=300154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=300154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=300154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}