{"id":302363,"date":"2017-07-31T16:58:26","date_gmt":"2017-07-31T16:58:26","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17816"},"modified":"2017-07-31T16:58:26","modified_gmt":"2017-07-31T16:58:26","slug":"return-customer-early-commercial-pv-adopter-re-ups-with-second-system-from-beaumont-solar","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/return-customer-early-commercial-pv-adopter-re-ups-with-second-system-from-beaumont-solar\/","title":{"rendered":"Return customer: Early commercial PV adopter re-ups with second system from Beaumont Solar"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Darn It! Inc., a family-operated distribution and refurbishment business located in New Bedford, Mass., contacted Beaumont Solar for another 234.5-kW solar array to pair with the 281.6-kW roof-mounted PV system it installed in 2011(the largest commercial solar rooftop in the City of New Bedford at that time). &ldquo;For a facility<a href=\"http:\/\/solarbuildermag.com\/news\/early-commercial-pv-adopter-re-ups-with-second-system-from-beaumont-solar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14330,2906,9974],"class_list":["post-302363","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-beaumont-solar","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/302363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=302363"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/302363\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=302363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=302363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=302363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}