{"id":303705,"date":"2017-08-04T12:52:49","date_gmt":"2017-08-04T12:52:49","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17862"},"modified":"2017-08-04T12:52:49","modified_gmt":"2017-08-04T12:52:49","slug":"fronius-inverters-now-california-rule-21-compliant","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/fronius-inverters-now-california-rule-21-compliant\/","title":{"rendered":"Fronius inverters now California Rule 21 compliant"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Fronius USA received UL certification for California&rsquo;s Rule 21 inverter requirements, which are required in California for new Net Energy Metering (NEM) applications from September 8. What&rsquo;s Rule 21 again? Rule 21 refers to the generator interconnection requirements of each California Investor-Owned Utility (IOU). A years-long process has been underway<a href=\"http:\/\/solarbuildermag.com\/news\/fronius-inverters-now-california-rule-21-compliant\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13215,12491,2906,3000],"class_list":["post-303705","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-fronius-usa","tag-inverters","tag-news","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/303705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=303705"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/303705\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=303705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=303705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=303705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}