{"id":305392,"date":"2017-08-07T17:51:34","date_gmt":"2017-08-07T17:51:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17887"},"modified":"2017-08-07T17:51:34","modified_gmt":"2017-08-07T17:51:34","slug":"baywa-commissions-28-mw-jacumba-solar-project-in-san-diego-county","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/baywa-commissions-28-mw-jacumba-solar-project-in-san-diego-county\/","title":{"rendered":"BayWa commissions 28-MW Jacumba Solar Project in San Diego County"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>BayWa r.e., a global renewable energy developer, wholesaler and energy solutions provider, announced t has commissioned the 28 -MW DC Jacumba Solar Project in San Diego County, Calif. BayWa r.e. acquired the project in late 2016, and in just seven months, completed the development and turn-key construction. The project was<a href=\"http:\/\/solarbuildermag.com\/projects\/baywa-commissions-28-mw-jacumba-solar-project-in-san-diego-county\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14592,2906,9974],"class_list":["post-305392","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-baywa","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/305392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=305392"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/305392\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=305392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=305392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=305392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}