{"id":305886,"date":"2017-08-09T17:55:00","date_gmt":"2017-08-09T17:55:00","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=17915"},"modified":"2017-08-09T17:55:00","modified_gmt":"2017-08-09T17:55:00","slug":"financial-details-on-michigan-state-university-solar-project-revealed","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/financial-details-on-michigan-state-university-solar-project-revealed\/","title":{"rendered":"Financial details on Michigan State University solar project revealed"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Alterra Power Corp. and Inovateus Solar LLC closed $19.9 million construction loan facility for the Spartan solar project, an 11 MW solar project located on the Michigan State University campus in East Lansing, Michigan. The loan facility is supplied by 1st Source Bank, a subsidiary of 1st Source Corporation &nbsp;and<a href=\"http:\/\/solarbuildermag.com\/news\/financial-details-on-michigan-state-university-solar-project-revealed\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9607,2906,9974],"class_list":["post-305886","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inovateus-solar","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/305886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=305886"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/305886\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=305886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=305886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=305886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}